1.
What kind of document does the engineering team usually create for products?
2.
What team is in charge of requests for quotation and purchase orders?
3.
What type of document/task would be triggered by a component issue?
5.
How is the “End” date/time calculated for an MO?
6.
What does it mean when the “Component Status” for an MO appears as “Available” in an ORANGE font?
8.
For products with multiple BoMs, which BoM is selected by default for manufacturing orders?
9.
Which of the following formats is not an option when adding a worksheet to an operation on a BoM?
10.
Which setting must be enabled to use work centers in the ‘Manufacturing’ app?
11.
What happens if the ‘Allowed Employees’ field on a work center form is left blank?
12.
On the ‘Work Centers Overview’ page, what happens when I click the monitor icon button on a work center’s card?
All of the work orders that are ready to process at that work center are displayed within the ‘Manufacturing’ app
All of the work orders that are ready to process at that work center are displayed within the ‘Shop Floor’ module
All open work orders are marked as ‘Done’
All late work orders are marked as ‘Done’
13.
How do I create a new work center?
14.
When a work order is assigned to a work center that is at capacity, which button should be clicked on the work order’s MO to schedule it at a different work center?
15.
When configuring an alternative work center, which of the following should be identical for both work centers?
16.
How do I open the form for a specific work center?
‘Manufacturing’ app -> ‘Operations’ -> ‘Work Centers’ -> select work center
‘Manufacturing’ app -> ‘Configuration’ -> ‘Work Centers’ -> select work center
‘Shop Floor’ module -> ‘Operations’ -> ‘Work Centers’ -> select work center
‘Shop Floor’ module -> ‘Configuration’ -> ‘Work Centers’ -> select work center
17.
Where can I find the ‘Production Information’ section on a work center form?
18.
After opening an MO, where can I see the expected duration for a specific work order?
19.
Which settings must be enabled to use work order dependencies?
20.
How do I enable work order dependencies on a bill of materials?
Tick the ‘Operation Dependencies’ checkbox at the top of the bill of materials form
Click the ‘Miscellaneous’ tab, and tick the ‘Operation Dependencies’ checkbox
Click the additional settings button on the ‘Operations’ tab, and tick the ‘Operation Dependencies’ checkbox
Operation dependencies are available by default on bills of materials
21.
On a confirmed MO, which button should be clicked to schedule when the MOs work orders will be carried out? ‘Plan’
22.
Which methods can be used to automatically generate an MO to fulfill the need created by an SO?
23.
When using the Replenish on Order (MTO) route to generate an MO, which route must also be enabled?
24.
Which product replenishment method always creates an MO when the product is included in a sales order?
25.
How many manufacturing steps should I use to record the transfer of finished products to inventory?
26.
How do I see all the product movements related to a specific MO?
27.
In which app can I select the number of steps required to process MOs?
28.
Which of the following is NOT true about long-term planning in Odoo?
29.
Where can I go to view upcoming work orders?
30.
Which of the following is TRUE about manufacturing lead times for planning?
Lead times determine the best start date for manufacturing orders and coordinate just-in-time manufacturing.
Lead times measure the exact time it takes to manufacture the product.
Lead times predict the weather forecast for the factory’s rooftop garden
Manufacturing lead times are set in Manufacturing > Configurations > Settings.
31.
Where can you define the manufacturing lead time for a specific product?
32.
What is a Customer Lead Time?
33.
Days to Prepare Manufacturing Order is calculated based on
34.
How do I split an MO into multiple MOs?
35.
How are split MOs titled?
36.
When merging two or more MOs, what must all MOs being merged have in common?
37.
Is it possible to assign a product a lot number that already exists?
38.
What happens after clicking ‘Prepare MO’ on the ‘Batch Production’ window when assigning serial numbers to multiple units of products in an MO?
39.
What happens after clicking ‘Produce’ on the ‘Batch Production’ window when assigning serial numbers to multiple units of products in an MO?
40.
What does the “Component Status” field on an MO show BEFORE components are picked for the order?
41.
When does the status of a “Store Finished Product” transfer change to “Ready”?
42.
In the Shop Floor module, how do I modify a work order to produce fewer units than originally intended?
43.
After an MO is split using a backorder, when does the backorder MO appear in the Shop Floor module?
44.
What happens to an MO when a backorder is created for it in the Shop Floor module?
The original MO appears as two separate MOs in the Shop Floor module, but remains a single MO in the ‘Manufacturing’ app.
The original MO appears as two separate MOs in the Manufacturing app, but remains a single MO in the Shop Floor module.
The original MO appears as two separate MOs in the Manufacturing app and the Shop Floor module.
An MO can only be created for an MO in the Manufacturing app.
45.
What type of maintenance is time and risk-based?
46.
Which of the following values is calculated based on equipment’s performance data, and previous maintenance requests?
47.
Where can I view all live Maintenance Requests for all Maintenance Teams?
48.
In Odoo, Make-to-Order (MTO) is …
49.
The Make-to-Order (MTO) route can be used for…
50.
In order to activate the Make-to-Order (MTO) route, you must first…
51.
On a bill of materials, where can by-products be added?
52.
How do I specify when the creation of a by-product occurs?
Select an operation in the ‘Produced in Operation’ field, next to a by-product on a bill of materials
Fill out the ‘Produced in Operation’ pop-up form that appears during the manufacturing process
Select an operation on the ‘By-Products’ tab of the product's form
It is not possible to specify when by-products are created
53.
After producing a certain quantity of a by-product, what happens to the on-hand quantity of that by-product?
54.
What is the status of a manufacturing order AFTER a component has been scrapped, but BEFORE it has been replenished?
55.
How do you scrap a finished product from an MO?
Before closing the MO, click the “Scrap” button, and select the finished product in the “Product” field on the pop-up window
Close the MO, click the “Scrap” button, and select the finished product in the “Product” field on the pop-up window
Finished products can only be scrapped from the Inventory app
Finished products cannot be scrapped
56.
What kind of order is created when a component is scrapped, while using two or three-step manufacturing?
57.
In which app can I create a new maintenance request?
58.
How do I view all scheduled maintenance requests for a specific team?
59.
How many transfer orders are created when manufacturing a product using one step?
60.
Where is one-step manufacturing enabled?
Inventory > Configuration > Warehouses > select a Warehouse > select “Manufacture (1 Step)” in the Manufacture field
Inventory > Configuration > select “One-step manufacturing”
Manufacturing > Configuration > Steps > select “One-step manufacturing”
Manufacturing > Operations > Manufacturing Orders > select MO > Miscellaneous tab > select “One-step manufacturing”
61.
What happens after you click “Mark as Done” on the final work order for an MO in the Shop Floor module?
62.
Which of the following is NOT a step in the three-step manufacturing process?
63.
What is the effect of ticking the ‘Block Workcenter’ checkbox on a maintenance request form for a work center?